Completed open kitchen with dark cabinetry, quartz hood and waterfall island
A residential case study

Project Niagara

A statement interior.
Shaped by connected decisions.

From design to completed space ↓
The ambition

“I want to make a statement piece.”

The homeowner’s brief

The homeowner’s ambition became the governing principle for a whole-home transformation. In the kitchen and living area, that request took shape through three connected focal points: a quartz range hood, a tiered waterfall island and a full-height fireplace.

The intended furnishings offered a direction: dark slatted finishes, white stone and gold accents. Repeating that language through the built elements gave the room a cohesive identity. At the homeowner’s request, the furniture was also templated and its original marble tops replaced with matching quartz, extending the material continuity from the fixed features into the furnishings.

The service selected

Full service.
From vision to completion.

The homeowner selected our full suite of services, from documentation of existing conditions and design development through construction planning, scope development and construction management.

For this project, the owner elected a hybrid delivery structure: managed specialist subtrades alongside key components self-performed by the project team. The island, quartz-clad hood, fireplace surround and hidden bedroom door were carried through by that team to preserve continuity between the approved vision and the finished details.

Design & planning

One coordinated direction.

Layout studies, renderings, selections and construction planning developed together, with owner input carried into the scope and details.

Construction management

Clear choices. Visible costs.

Subcontractor proposals were solicited on the owner’s behalf, qualified and reviewed together in person. Side-by-side comparisons made pricing and scope differences visible before selections were made. The resulting contracts were executed and administered on the owner’s behalf.

Selective self-performance

Continuity in the defining details.

Direct execution of the signature features kept proportion, material transitions and fit closely connected to the design, while the wider trade work was coordinated around them.

01 / Design & completed work

The idea,
made tangible.

Explore the kitchen, island and concealed laundry entrance. Each pair shows a design stage alongside the completed space.

Kitchen design rendering with dark cabinetry and quartz hood
Design rendering
Completed kitchen with the quartz hood, island and coordinated dark cabinetry
Completed space

The renderings capture a stage in design development. Final selections and refinements continued as the project progressed.

02 / Understanding the space

Every change
has a reach.

Schematic design began with field measurements, documentation of existing conditions and an on-site discussion of the homeowner’s intended layout revisions. The first proposed floor plan translated that direction into an initial arrangement.

At this stage, the drawing was the equivalent of a napkin sketch: a starting point to mark up, question, change and revise together. Every option remained on the table. The purpose was to explore possibilities and give the homeowner something tangible to respond to before developing the plan in greater detail.

A subsequent conversation about that initial plan revealed an opportunity. The homeowner found it odd that the primary bedroom door opened directly off the living room beside the fireplace. That casual observation inspired a concealed entrance—and a theme that reached beyond one doorway.

The same idea informed the laundry access, shifting its proposed door location and bringing greater definition to the layout. Separate kitchen, office and living areas could become an expansive shared space, with everyday access integrated into the overall composition.

Existing home floor plan showing separate kitchen and living areas
Existing layout
Early proposed layout opening the kitchen toward the living space
First proposed arrangement / an open starting point
Developed layout study showing the revised interior arrangement before scaled plan development
Final layout study / before scaled plan development

The layout was refined through discussion before moving into scaled plan development and detailed cabinet layouts and elevations.

The full scope

A whole home.
Reconsidered.

The statement features sit within a comprehensive renovation: two fully remodeled bathrooms, reconfigured living spaces and renewed finishes throughout the home.

Wallpaper was removed, walls were skim-coated and finished, and existing ceiling texture was sanded and skimmed before a Spanish lace finish was applied throughout. Approximately 80 percent of the home was rewired, with electrical devices replaced throughout. Windows and entry doors were renewed, along with an exterior deck, waterproofing assembly and cable railing.

The visible transformation began with understanding what the existing building would allow—and what needed to change beneath the finishes.

Investigate

Verify before refining.

Selective investigative demolition during design development exposed underlying substrates and tested assumptions. The findings informed layout decisions, sequencing and the scope of concealed work.

Prepare

A level foundation.

Existing cementitious sound-deadening underlayment varied in thickness, leaving floor elevations out of level by as much as 1¾ inches. Wall removals, tile demolition and plumbing access also required localized removal and replacement, with acoustic separation from the occupied home below considered throughout.

Target elevations were established across the approximately 2,200-square-foot footprint. Roughly 4,500 pounds of leveling compound brought the floor into the tolerances needed for glue-down engineered hardwood and kitchen cabinetry.

Coordinate

Plan the path to completion.

Upper-floor access through switchback stairs and a shared elevator shaped material delivery, waste removal and labor planning. More than 60 cubic yards of demolition debris were removed. Daily protection of common areas and consideration for neighboring residents were part of the work from the outset.

03 / The composition

One language.
Across the room.

The waterfall island grounds the kitchen composition. Behind it, the full-height backsplash and quartz-clad hood carry the material upward, creating a visual connection from floor to ceiling. Movement within the veining draws the eye across these surfaces; the full-height fireplace answers that gesture in the living area.

Dark slats establish rhythm beneath the island and beside the fireplace. Gold accents echo the intended furnishings. Each feature has its own presence, while repeated materials, balanced proportions and carefully resolved transitions hold the overall composition together.

Quartz waterfall return with expressive veining, dark slats and an illuminated gold toe kick
The island / two levels, one composition
The waterfall island

Depth without
visible support.

A lower kitchen surface accommodates the sink and dishwasher. Above it, a bar-height seating surface turns down at the ends in mitered waterfall returns.

Movement in the quartz continues across the mitered returns, giving the stone a sculptural presence. Beneath the overhang, stain-matched slats echo the intended furnishings. They stop above a gold toe kick, carrying the furniture’s palette and proportions into the architecture.

Behind the finished surface

Manufacturer coordination established the support and deflection criteria for the 2 cm Cambria. Five concealed brackets were recessed into the stud wall cladding and extended into routed channels in a laminated Baltic birch base. The 20-inch-deep seating surface includes a 16-inch cantilevered overhang and a 92-inch overall span. The substrate and finished thickness were developed around both the material requirements and the intended proportions.

The quartz range hood

A strong presence.
A concealed structure.

The full-height backsplash carries the movement of the quartz through the cabinet run and into the hood above. Together with the waterfall island, it grounds the kitchen in a continuous material language, extending the composition from floor to ceiling. The hood’s quiet, precise silhouette depended on a carefully sized structure beneath the stone.

How the assembly was coordinated

A laminated birch plywood shell was established, accounting for the material thicknesses of the cement board, setting material and quartz wrap. A French cleat transferred load to the wall. Supplementary threaded rods and strut braces connected the forward portion to ceiling joists, distributing the load and allowing fine adjustment during installation. The support arrangement accommodated the quartz and ventilation insert within the intended silhouette.

Quartz veining continues around the mitered hood above the full-height backsplash
The hood / material and structure developed together
Full-height quartz fireplace with recessed television and adjacent slat finish
The fireplace / the kitchen palette carried into the living area
The fireplace wall

One feature.
Many interfaces.

A quartz center section approximately seven feet wide and nine feet tall gives the living area its focal point. Sequential slabs carry the movement of the veining through its full height, with the selected fireplace and television recessed into the composition.

Recess depths, backing, clearances, ventilation, power, data and future access were considered as one assembly. The television was templated and the quartz opening carefully refined to achieve the flush fit.

Resolving the insert and surround

The fireplace’s installation requirements informed the framing, selective use of steel studs and noncombustible materials, and its offset from the quartz. The television mount and backing were planned together with concealed ventilation and service access. These requirements shaped the finished proportions.

04 / Concealed function

Continuity,
open or closed.

The bedroom entrance became part of the slat wall. The feature on the opposite side was built out to match the closed door’s thickness, giving the fireplace a balanced setting.

When the door opens, the finish returns into the bedroom. Slat spacing preserves a consistent reveal at the last visible edge. A custom cherry slab, reinforced for the trackless hardware and stained to match the cabinetry, makes the movement part of the design.

Concealed bedroom door closed within the slat-wall finish
Bedroom entrance / closed
Concealed bedroom door open with slat finishes continuing around the opening
Bedroom entrance / open
Designing around available materials

A soffit brought the functional height of the adjoining slat wall below eight feet to suit the available prefinished cherry plywood and slats. Wall depths, returns and door details were established together, preserving the intended composition while working with material sizes.

The walkthrough laundry

A room behind
the cabinet run.

Full-height pantry doors nearly disappear when closed. Their opening, the surrounding cabinet widths and the laundry-side counter depth had to be coordinated before finished materials arrived.

Framing allowed for drywall, prefinished plywood returns, trims and consistent door gaps. Minimizing fillers depended on understanding the full assembly around the outside corner in relation to the established walkthrough opening.

Completed full-height cabinetry with the laundry doors closed
Laundry entrance / closed
From assembly to expression

The work within
the finished form.

Progress photographs reveal the coordination behind the composition: a precisely sized hood enclosure and a fireplace wall developed around the inserts, recessed television and moving doorway.

Range hood enclosure during construction before the quartz wrap
In progress / the hood enclosure before quartz
Fireplace and television recess during installation with the custom door slab closed
In progress / openings and door slab in place
Same fireplace assembly with the doorway open during installation
In progress / the doorway and adjacent assembly
05 / Living with the design

Considered
behind the scenes.

RGB downlighting, under-cabinet lighting and toe-kick lighting change the atmosphere on demand. Lighting and sound share a single interface, with relays and associated components concealed in an accessible laundry cabinet.

Early appliance selections allowed gas and water connections to be precisely positioned and recessed. Flush placement was considered alongside future access to shutoff valves. The finished appearance and the ability to maintain the space belonged to the same plan.

06 / Project planning in practice

The plan,
within reach.

Coordination has to reach the people doing the work. Full-size scaled drawings were maintained on site alongside a continuity folder with indexed, room-by-room information.

Overall layouts, key features, established elevations and dimensions, product selections, specifications and cut sheets gave each trade a common reference. The folder connected the intended result to the information needed to build it.

A shared reference

The right information, together.

For a plumbing rough-in, the selected valve was available on site alongside the faucet selection, product information and dimensioned layout. Its position was coordinated with the finished countertop and the thicknesses of the complete assembly.

From drawing to field

Make the location visible.

After rough framing, blocking was installed for cabinetry and key features. Rough plumbing locations were physically marked on the wall, providing a field reference alongside the drawings. These checks reduced ambiguity and the potential for installation errors while accounting for adjacent work by subsequent trades.

An evolving record

Keep the plan current.

Field adjustments were recorded on the site copy of the drawings and incorporated into an as-built drawing set. The documented plan continued to reflect the work as it developed.

Kitchen cabinet layout study showing cabinet positions, dimensions and island clearances
Cabinet layout study / kitchen
Laundry cabinet elevation study showing cabinet heights, appliance positions and dimensions
Cabinet elevation study / laundry
Room for the vision to evolve

As the rooms took shape, the homeowner requested dozens of changes and refinements. Each was considered for its cost, timing, phasing and effect on connected work, with decisions documented and the design and affected scopes updated. The hybrid structure helped the team respond while keeping the finished home aligned with the owner’s intent.

The result

The design,
carried through.

The finished space brings the homeowner’s statement-piece ambition into everyday use. Repeated materials and proportions connect the major features; concealed planning allows them to function as a whole.

Project Niagara helped inspire Intent: a collaborative process in which design, construction planning and the homeowner’s decisions develop together.

Revisit design & completed work ↑
Your project, thoughtfully developed

What do you have
in mind?

Let’s talk about the space and the result you want to achieve.

Talk with Robert ↗Send a project inquiry ↗